ASMR 2017
Other Points to Consider
• Planning Risk Volume
Margin added to true structure
ICRU 83
RTOG H&N Trials
• Additional structures to assist in decision making at the linac
Minimum allowable bladder volume
Moore and Forde, JMIRS 2017
Made with FlippingBook