Advanced TP
20 tips and tricks for happy IMRT planning
18
be critical towards objectives that highly contribute to the total cost after the optimisation it is likely that the overall result of your optimization predominantly determined by these objectives (for instance if you have a min dose objective to a structure in the build-up region, a high cost might alarm you)
setting objectives
start optimisation
beam setup
evaluate
contouring
Made with FlippingBook