Basic Treatment Planning

Isocentre Placement 2

• Reference point

will not need moves/verification not always suitable for ipsilateral target

• Centre of PTV

will require daily moves in all directions and verification

• Standard moves

will require moves daily and verification but can be made in whole numbers and only in required directions • For ease of set-up and accuracy no moves from ref. point is the ideal (high proportion of errors in RT are in relation to moves) however if needed try to keep them standard

Made with