Dose Course 2018_Flipping book
Q1
Pre-treatment verifications check that:
1. The treatment is delivered to the patient as planned
2. The machine can deliver the treatment as planned
3. The patient positioning and anatomy is the same as planned
4. All above are correct
Made with FlippingBook HTML5