Quality Management 2017
Introducing a SPC analysis: DMAICS method* * From a Six sigma approach
D EFINE
Target ?
Choice of relevant quality indicators to monitor
M EASURE 1. Verification of the measurement system ‘s capability 2. Characterization of the data distribution
3. Observation of the process Building a control chart without limits
Data (chronological order)
Monitored parameter
A NALYZE
A NALYZE Searching the sources de of variability (Ishikawa)
Choice of control charts and calculation of control limits Calculation of the process performance indicators
C ONTROL
I MPROVE
Process monitoring using control charts
Reduction of variability (5 WHY, Design of Experiments)
Is the process ‘under control’? Detection of special causes
C ONTINUOUS IMPROVIEMENT
S TANDARDIZE
Optimization of the process, maintain the gain Reduction of the frequency of controls?
03/10/17
5
Made with FlippingBook - Online Brochure Maker