Step 5: follow actions decided and indicators deployed. Risk mapping obtained facilitates identification of priority actions to be carried out and to follow and is represented in tabular form. Results For each project, we obtained a detailed scoreboard with the different phases and with risks assessed. Application of FMECA highlighted different vulnerable phases of each project. Critical phases identified for center 2 project include the shutdown of old accelerator (delayed take-over as only one accelerator in operation on 2) or staff training on the new machine. Vulnerable phases identified in center 1 project are, among others, the maintenance of treatments on the 2 sites: there must be sufficient staff to ensure safe care on the old and new technical platform. The start of medical consultations is a critical moment too as these consultations will no longer be on the same level as the technical platform. Staff training on new equipment is also a critical phase for the move project as well as for the accelerator replacement project. Various preventive actions have taken place out of these 2 risk analyzes: staff recruitment, new medical consultation plan, development of a training program and adaptation of treatment schedules. The figure 1 shows an extract of FMECA scoreboard obtained for center 1 project. Sharing of experience between the 2 RT departments on the risk analysis of their respective project allows the pooling of results. It also allows to find common vulnerable phases in both projects.

Conclusion The novel approach of the live update has been successful in providing a lean process ensuring that the latest evidence reaches clinical radiotherapy practice. An innovative collaboration incorporated Clinical Librarians with the radiotherapy MDT for ensuring an efficient, methodical approach and improved team working. The lean process of the real-time live update resulted in a small investment of time from the MPT ensuring up-to- date clinical practice based on the latest evidence contributing to improved patient outcomes. PO-1100 Risks related to replacement of technical platform: shared experience of 2 radiotherapy centers. S. Cucchiaro 1 , M. Delgaudine 2 , A. Batamuriza-Almasi 3 , P. Coucke 1 1 C.H.U. - Sart Tilman, Radiotherapy department, Liège, Belgium 2 C.H.U. - Sart Tilman, STA Quality department, Liège, Belgium 3 CH-EpiCURA, Radiotherapy department, Baudour, Belgium Purpose or Objective Replacing a linear accelerator in a Radiation Therapy (RT) department is a complex operation. 2 RT centers are currently undergoing this change. Center 1 is moving his RT department to a new technical platform and center 2 is replacing an accelerator. To guarantee the quality and performance of these projects, one might prospectively analyze problems that can occur through risk management methods such as Failure Modes Effects and Criticality Analysis (FMECA). Material and Methods The 2 projects have been defined and structured. A risk analysis according to FMECA process was carried out. This analysis is divided into 5 steps. Step 1: break down the 2 projects in into sever al phases. Step 2: identify failure modes, their effects, and possible causes. Step 3: establish a risk assessment scale and classify the risks. The evaluation was based on 3 criteria: Severity (S), frequency of Occurrence (O) and probability of Detection (D). Criticality Index (CI = S x O x D) was calculated for each identified risk. Step 4: identify appropriate preventive actions and set up action plans.

Conclusion FMECA provides a systematic method for finding vulnerabilities in a project before generating a dysfunction. FMECA allows us to improve quality and safety of patient care during these different changes in the 2 centers. The pooling of the results of the 2 RT departments helps make risk analysis more systematic and robust and allows to save time in the choice and the implementation of preventive actions.

Made with FlippingBook - Online magazine maker